04.04.2022 – On this day, I continued analyzing the existing model for the Kanuga Chapel. I continued pushing the plans and revising them to the most recent on-site measurements that we took at the last site visit. Total Hours (4:00) | AXP Hours – Project Development and Documentation 04.05.2022 – On this day, I continued […]
Author: aylawooten
March 28 to 31 | Moseley Architects | Weekly Journal
03.28.2022 – On this day, I continued working on the revit model for the Kanuga Chapel project. I was tasked with turning the model into a central model as well as apply the Moseley template. It was very important that I completed these tasks correctly, so that the model can be worked on by multiple […]
March 14 to 17 | Moseley Architects | Weekly Journal
03.14.2022 – Missed to work on studio work. Total Hours (0:00) | AXP Hours – 03.15.2022 – On this day, I continued work on the Kanuga Chapel existing revit model and also continued building the new proposed parts. I learned how to create a stacked wall in revit while building the new proposed sections. Total […]
March 7 to 10 | Moseley Architects | Weekly Journal
03.07.2022 – On this day, I worked on Kanuga Chapel in Hendersonville, North Carolina. I was first debrief on the project and told the history of the chapel. After learning about the extents, I began work on finishing up the existing revit model. Total Hours (4:00) | AXP Hours – Project Development and Documentation 03.08.2022 […]
Feb 21 to 24 | Moseley Architects | Weekly Journal
02.21.2022 – On this day, I worked on Folly Beach City Hall construction documentation set. I drafted more on the construction details to push them closer to completion. After working on that for a couple of hours, I switched to finishing up adding details to the context model. The buildings adjacent to our structure are […]
Feb 28 to Mar 3 | Moseley Architects | Weekly Journal
02.28.2022 – I did not attend work on this day, instead time was spent working on the community build studio project. Total Hours (0:00) | AXP Hours – NA 03.01.2022 – Today, I worked on construction details for Folly Beach City Hall. It is an existing building, so the details of showing how the new […]
4.29.19 Daily Blogs and Weekly Reflections
4.29.19 I did not work this date because of thefinal review for studio. 4.30.19 Today, I worked 9am to 5pm on construction documents and wall section details. I am becoming more comfortable with drawing wall section details in autocad and have learned a lot more about construction. 5.1.19 I will not be working this date […]
4.22.19 Weekly Reflection and Daily Blogs
I did not work this week due to finals.
4.15.19 Daily and Weekly Reflections
4.15.19 Today, I worked in Autocad on arranging casework in the floor plan. I learned about commercial kitchens and what is needed in the space for them to run efficiently. 4.16.19 Today, I began modeling a sample wall in Revit showing the materials that will most likely be used for the project. I modeled […]
03.25.19 Daily Blog and Weekly Reflection
3.25.19 Flight back from spring break was cancelled, missed work because I was not back in SC yet. 3.26.19 Today, I worked on renderings in enscape and changed material colors as requested by the client. This took about a hour and is in the project development and documentation category. Then, I went to a pre-bid […]