2/28 | Summerville Townhomes On Monday, I worked on various sheets for our big CD Set push which we are hoping to submit on Wednesday. We met with Laura Middleton to discuss the internal redlines she made. There’s plenty to still develop, but we’re confident we can get it done in time. (4.5 hours […]
Month: May 2022
Andrew Schick | The Middleton Group | Week 6
2/21 | Summerville Townhomes Redlines (Construction Documentation – 4 hours) 2/22 | Summerville Townhomes Redlines (Construction Documentation – 4 hours) 2/23 | Pickle Bar + Home Team BBQ Commcheck / Home Team BBQ Stage Design (Practice Management – 3 hours) (Schematic Design – 1 hour) 2/24 | Home Team BBQ / Internship Meeting @ Cigar […]
Andrew Schick | The Middleton Group | Week 5
2/14 | DID NOT WORK. 2/15 | Summerville Townhomes Desk Cubicle setup at new office Floor Plan revisions (Construction Documentation – 2 hours) 2/16 | Summerville Townhomes Electrical Floor Plan revisions (Construction Documentation – 3 hours) 2/17 | Summerville Townhomes Section Detail revisions (Construction Documentation – 3 hours)
Andrew Schick | The Middleton Group | Week 2
1/24 | Derrington Dermatology Casework development – (4 hours – Construction Documentation) 1/25 | Derrington Dermatology Casework development – (3.5 hours – Construction Documentation) 1/26 | Summerville Townhomes Project Introduction & Floor plan development – (4 hours – Construction Documentation) 1/27 | Summerville Townhomes Floor Plans (cont.) Elevation + Section development – (3.5 hours – […]
Andrew Schick | The Middleton Group | Week 0 & Week 1
1/13 | Onboarding – (2 hours) Introduction to Pickle bar project w/ Will – (1 hour – Project Management) Material mapping in Lumion – (1 hour – Design Development) 1/17 | Derrington Dermatology Interiors | Revit material creation via vendor samples for Mary Catherine – (3 hours – Construction Administration) 1/18 | Derrington Dermatology Introduction to […]
Andrew Schick | The Middleton Group | Week 12
4/4 | Goose Creek Amphitheater Pavilion Stage + Amphitheater redesign Restroom facility layout re-design in Revit [3.5 hours – Schematic Design + 0.5 hours – Project Management] 4/5 | Goose Creek Amphitheater Pavilion Stage + Amphitheater redesign Restroom facility layout re-design in Revit [4 hours – Schematic Design] 4/6 | Goose Creek Amphitheater Pavilion Stage […]
Reece Brown | Metanoia | Week 12
Reece Brown | Metanoia | Week 12 Metanoia 4804 Boulevard 4804 Boulevard Ln, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks Monday (4/25): 9:21 – 12:19 When I first looked at the sketched plan for this house, I had a lot of trouble reading and understanding it. I wrestled with […]
Reece Brown | Metanoia | Week 11
Reece Brown | Metanoia | Week 11 Metanoia 2664 BYL 2664 Bennet Yard Lane, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks Monday (4/18): 8:07 – 11:09 I had a meeting with Duncan and we discussed the progress on the model for the BYL house, which was getting finished up […]
Reece Brown | Metanoia | Week 10
Reece Brown | Metanoia | Week 10 Metanoia 2664 BYL 2664 Bennet Yard Lane, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks Monday (4/11): 8:12 – 12:11 Duncan had me pick back up on a project that we started but had some hold-ups on. Bennet Yard Lane was a house […]
Reece Brown | Metanoia | Week 9
Reece Brown | Metanoia | Week 9 Metanoia 1919 Carlton 1919 Carlton Street, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks Monday (4/4): 8:14 – 12:32 I worked on more final production drawings based on edits Duncan gave and examples he shared with me. I was very interested to see […]