Reece Brown | Metanoia | Week 8

Reece Brown | Metanoia | Week 8 Metanoia 1919 Carlton 1919 Carlton Street, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks   Monday (3/28):  7:56 – 12:34  On the Monday after the break, Duncan and I had a quick Teams meeting so I could show him my progress on the model […]

Reece Brown | Metanoia | Week 6

Reece Brown | Metanoia | Week 6 Metanoia 1919 Carlton 1919 Carlton Street, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks   Monday (3/14):  8:09 – 11:54  I met with Duncan on Teams to discuss some of the ideas he had for the 1919 Carlton model and renders.  I took the […]

Reece Brown | Metanoia | Week 5

Reece Brown | Metanoia | Week 5 Metanoia 1906 Success 1906 Success Street, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks   Monday (3/7):  8:08 – 11:38  Monday was just for making adjustments to the park plan.  I added shading to the ground and cleaned up line weights.   Tuesday (3/8):  […]

Reece Brown | Metanoia | Week 4

Reece Brown | Metanoia | Week 4 Metanoia 1919 Carlton 1919 Carlton Street, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks   Monday (2/28):  9:00 – 11:00  Duncan was supposed to be getting back on Monday but ran into some delays and we pushed our planned Teams meeting about 1919 Carlton […]

Reece Brown | Metanoia | Week 3

Reece Brown | Metanoia | Week 3 Metanoia 1919 Carlton 1919 Carlton Street, North Charleston Duncan Cheney Help Duncan with design, drawing, and daily tasks   Monday (2/21):  8:00 – 12:01  This week, Duncan was out of town so I just worked on the 1919 Carlton layout to try and figure out which floor plan […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 14

4/25/22 I had to go back into the KRH hotel campus model to replace old Bahama shutter with paneled. 04/26/22 Continued working on replacing old shutters in model with the paneled shutters that we more appropriate design option. 04/27 /22 Made revisions and printed all the elevations. 04/28/22 I didn’t have any work to do […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 13

04/18/22 Created an extensive excel sheet based on parking capacity and the zoning that applied to 320 East Bay project and the different possible programming of the site. 04/19/22 made parking massings in Revit for different variations of retail programming. 04/20 /22 Met with mentor to discuss how we were going to package the studies […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 12

04/11/22 Continued to add reveals on two buildings in the KRH campus, began to print the elevation s into pdf form. Added an intro page to my booklet of elevation that explained the changes made the past few days. 04/12/22 finalized printing pdfs and made revisions with my mentor. 04/13 /22 Began a new project […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 11

04/04/22 had long conversation about shutter types to be added to KRH hotel campus  and began to change then out across all the buildings. 04/05/22 Changing out shutters in all buildings and editing shutter families. 04/06/22 continued to edit shutter family on a specific Bahama type. 04/07/22 Created reveals on the first floors of all […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 10

03/28/22 Worked on a narrative for KRH campus project and organization an architectural set. 03/29/22 finished up the narrative and created a name-tag to welcome a new employee. lastly I worked on filling up information for a permit resubmit design certification. 03/30/22 Worked on adding in annotations/design options to FEMA set of walls from prior […]