NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 14

4/25/22 I had to go back into the KRH hotel campus model to replace old Bahama shutter with paneled. 04/26/22 Continued working on replacing old shutters in model with the paneled shutters that we more appropriate design option. 04/27 /22 Made revisions and printed all the elevations. 04/28/22 I didn’t have any work to do […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 13

04/18/22 Created an extensive excel sheet based on parking capacity and the zoning that applied to 320 East Bay project and the different possible programming of the site. 04/19/22 made parking massings in Revit for different variations of retail programming. 04/20 /22 Met with mentor to discuss how we were going to package the studies […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 12

04/11/22 Continued to add reveals on two buildings in the KRH campus, began to print the elevation s into pdf form. Added an intro page to my booklet of elevation that explained the changes made the past few days. 04/12/22 finalized printing pdfs and made revisions with my mentor. 04/13 /22 Began a new project […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 11

04/04/22 had long conversation about shutter types to be added to KRH hotel campusĀ  and began to change then out across all the buildings. 04/05/22 Changing out shutters in all buildings and editing shutter families. 04/06/22 continued to edit shutter family on a specific Bahama type. 04/07/22 Created reveals on the first floors of all […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 10

03/28/22 Worked on a narrative for KRH campus project and organization an architectural set. 03/29/22 finished up the narrative and created a name-tag to welcome a new employee. lastly I worked on filling up information for a permit resubmit design certification. 03/30/22 Worked on adding in annotations/design options to FEMA set of walls from prior […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 9

03/14/22 RFI revisions- sections drawings and working on drawing a detail for the back of house on a building of Kiawah River hotel.   03/15/22 Design options for all the first floors of the Kiawah river campus by switching out of the walls for MA8 wall types due to FEMA conditions. 03/16/22 Continued working of […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 8

03/07/22 I didnt have much lined up for me to do this day so I updated my Ncarb log and my CACC intern blogs then helped organize a few files that were being printed as revisions. 03/08/22 On Tuesday I helped organize documents and prints PDFs. I updated a project narrative and updated the organizati9on […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH |WEEK 2

01/24/22 -01/25/22 On the 17th I was assigned to the corporate studio and introduced to our major working projects, notably the Cooper Waterfront Hotel and the Kiawah River Hospitality project. That day I worked on a series of construction documents of the elevators that were to be placed in the Kiawah project and I checked […]

NICOLLE REBOLLEDO | MCMILLAN PAZDAN SMITH | WEEK 3

01/31/22 This day I was introduced into a new task that was making mark up to construction documents and section details to some porch details of the Kiawah River Hotel. First I started with deleting simple details like excess arrows. 02/01/22 I moved on to making general corrections to structural detail drawings. 02/02/22 I continued […]