Shane Lenard Week 10.26.20 – 10.29.20

~Novus Architects~ Monday (10.26.20) Today we began with the typical Monday morning meeting with the Charleston office which lasted an hour. Grant and I met, and we discussed vet clinic. After I started to set up the separate core – shell and interior views I put them on the corresponding sheets. I then started to […]

Brian Heape + Pinnacle Architecture : 10.26.2020-10.29.2020

Pinnacle Architecture 701 East Bay Street, Suite 302 Charleston, South Carolina Week 8 (October 26 – 29) Weekly Hours: 24 Total Hours: 252 Tasks Preformed: Annotate Elevations for Prototype School Begin Section Annotations Records of Work: Project Title: Prototype Elementary School Project Location: N/A Project Scope: Convert existing prototype elementary school from AutoCAD into Revit. […]

Week 7: 10.19-10.23

Monday (10/19): OFF Tuesday (10/20): Dimension Plans in Revit (P&A: 3.5) Wednesday (10/21): New Addition in Revit (P&A: 3.5) Thursday(10/22): Finish Presentation (PD&D: 3.5) Friday(10/23): Field Report (P&A: 3.5)   Reflection: This week was a shorter week for me. I did a dimension plan for a few options on a house renovation on Tuesday. Then […]

SMHa : Week Nine

Week Nine 10.19.2020 – 10.22.2020; SMHa  Weekly Reflection My ninth week at SMHa was very productive for me, as I was kept very busy and had to prioritize a few different tasks for a few different people in the office. I find that I enjoy having pending work for me to do because I feel […]

Week 6: 10.12-10.16

Monday (10/12): Placed Existing and New Floor Plans in Revit (P&A: 3.5) Tuesday (10/13): Placed Existing and New Floor Plans in Revit (P&A: 3.5) Wednesday (10/14): Site Visit to Confirm Existing Measurements (PD&D: 3.5) Thursday(10/15): Punch List (CA: 3.5) Friday(10/16): Placed Existing and New Floor Plans in Revit (P&A: 3.5)     Reflection: This week […]

Week 5: 10/05-10-09_RIA

Monday (10/05): Placed Existing and New Floor Plans in Revit (P&A: 3.5) Tuesday (10/06): Site Visit to Residence for Field Measurements (P&A: 3.5) Wednesday (10/07): Site Visit to Mitchell for Code Review of Handrails (CA: 3.5) Thursday(10/08): Entered New Floor Plans into Revit (P&A: 3.5) Friday(10/09): Updated Architectural Lighting Plan to Match Electrical Plan (CA: […]