~Novus Architects~ Monday (10.26.20) Today we began with the typical Monday morning meeting with the Charleston office which lasted an hour. Grant and I met, and we discussed vet clinic. After I started to set up the separate core – shell and interior views I put them on the corresponding sheets. I then started to […]
Month: October 2020
Claire McManus + Herlong Architects : Week 8 – 10.26-10.30
Week 8 : 16 hours 10/26 – 10/30 Isle of Palms – Sandlapper Design Group Monday : 4 hours I started a new project this week in SketchUp. One of the company’s Herlong owns is Sandlapper Design Group and they focus the majority on renovations/remodels. The clients bought an existing beach front house […]
Brian Heape + Pinnacle Architecture : 10.26.2020-10.29.2020
Pinnacle Architecture 701 East Bay Street, Suite 302 Charleston, South Carolina Week 8 (October 26 – 29) Weekly Hours: 24 Total Hours: 252 Tasks Preformed: Annotate Elevations for Prototype School Begin Section Annotations Records of Work: Project Title: Prototype Elementary School Project Location: N/A Project Scope: Convert existing prototype elementary school from AutoCAD into Revit. […]
Autumn Hinson + JMO Woodworks, Week 10.26 – 10.29
Daily Log Monday (10/26): Sanded medicine cabinet doors Milled and sawed raw, rough wood for window sill Cut a scarf joint into window sill wood Glued scarf joint pieces together to make one long window sill AXP Hours : 4 – Project Development & Documentation Tuesday (10/27): Sanded medicine cabinet doors Joined window sill […]
Andrew Matthews + COAST, Week 10.16.20 – 11.01.20
Marketing & Submittals. The past two weeks for me at Coast have focused a majority of my time on firm marketing and designing submittals to present my firm’s work. I have learned how to draft submittals as well as the beast that is the Standard Form 330. Relying on my graphic and creative skills learned […]
Week 7: 10.19-10.23
Monday (10/19): OFF Tuesday (10/20): Dimension Plans in Revit (P&A: 3.5) Wednesday (10/21): New Addition in Revit (P&A: 3.5) Thursday(10/22): Finish Presentation (PD&D: 3.5) Friday(10/23): Field Report (P&A: 3.5) Reflection: This week was a shorter week for me. I did a dimension plan for a few options on a house renovation on Tuesday. Then […]
SMHa : Week Nine
Week Nine 10.19.2020 – 10.22.2020; SMHa Weekly Reflection My ninth week at SMHa was very productive for me, as I was kept very busy and had to prioritize a few different tasks for a few different people in the office. I find that I enjoy having pending work for me to do because I feel […]
Week 6: 10.12-10.16
Monday (10/12): Placed Existing and New Floor Plans in Revit (P&A: 3.5) Tuesday (10/13): Placed Existing and New Floor Plans in Revit (P&A: 3.5) Wednesday (10/14): Site Visit to Confirm Existing Measurements (PD&D: 3.5) Thursday(10/15): Punch List (CA: 3.5) Friday(10/16): Placed Existing and New Floor Plans in Revit (P&A: 3.5) Reflection: This week […]
Week 5: 10/05-10-09_RIA
Monday (10/05): Placed Existing and New Floor Plans in Revit (P&A: 3.5) Tuesday (10/06): Site Visit to Residence for Field Measurements (P&A: 3.5) Wednesday (10/07): Site Visit to Mitchell for Code Review of Handrails (CA: 3.5) Thursday(10/08): Entered New Floor Plans into Revit (P&A: 3.5) Friday(10/09): Updated Architectural Lighting Plan to Match Electrical Plan (CA: […]
Claire McManus + Herlong Architects : Week 7 : 10.19.20-10.23.20
Week 7 : 16 hours 10/19 – 10/23 3213 Middle Street Project – Sullivan’s Island Monday : 4 hours I worked on a final render for the clients with a few minor adjustments. I processed a higher quality image for the renders, and while they inevitably took longer, they are very crisp and […]