Autumn Hinson | AJ Architects | Week 14

Monday (4/18/22): Today, I worked on adjusting the plans and elevations to 186 Spring St. The plans needed to work with the window opens proposed in the new elevations. Total Hours (3:57) | AXP Hours – Planning & Design Tuesday (4/19/22): Today I worked on adjusting the plans and elevations to 186 Spring St. Total […]

Autumn Hinson | AJ Architects | Week 13

Monday (4/11/22): Today, I worked on windows and door schedules for 11.5 St. Philip St. Total Hours (3:51) | AXP Hours – Planning & Design Tuesday (4/12/22): Today I worked on the carriage house for 109 Rutledge. I worked on drafting 2 sections and adjusting elevations to match the changes from lifting the structure a […]

Autumn Hinson | AJ Architects | Week 12

Monday (4/4/22): Today, I worked on sections for 11.5 St. Philip St. I worked out a few connection details between materials and joints. Total Hours (4:08) | AXP Hours – Planning & Design Tuesday (4/5/22): Today I continued work on 11.5 St. Philip St sections for the first half and then I jumped on making […]

Autumn Hinson | AJ Architects | Week 10 & 11

Week 10: Spring Break   Monday (3/28/22): Today, I worked on adjusting the plans and elevations for 11.5 St. Philip. I cut a transverse section through the building and attempted to locate openings and other details. Total Hours (4:40) | AXP Hours – Development & Documentation Tuesday (3/29/22): Today, I continued work on adjusting the […]

Autumn Hinson | AJ Architects | Week 9

Monday (3/14/22): Today, I worked on finishing the floor plan for 65 Barre. That task didn’t take long so I moved to combining images and looking for sanborn maps for the BAR submittal for demolition. I moved on to modeling floor plan renovations at 109 Rutledge in CAD. Total Hours (4:14) | AXP Hours – […]

Autumn Hinson | AJ Architects | Week 8

Monday (3/07/22): Today, I continued work on the lighting plan at 166 E Edgewater. I then started a window and door schedule for the same project and had to adjust the plans and elevations to match each other. Total Hours (4:01) | AXP Hours – Planning & Design Tuesday (3/08/22): Today I worked on adjusting […]

Autumn Hinson | AJ Architects | Week 6

Monday (2/21/22): I have been quarantined at home this week with Covid and I was not feeling well today so I updated 2 CAD drawings and made them into PDFs. Total Hours (0:10) | AXP Hours – Planning & Design Tuesday (2/22/22): Today I worked on adjusting the floor plan for 186 St. Philip Street. […]

Autumn Hinson | AJ Architects | Week 5

Monday (2/14/22): I worked on 124.5 & 122.5 Cannon Street Duplexes today. I designed the exterior staircase and balcony screen for 124.5 and then I lowered and changed the roof design for 122.5 Total Hours (2:50) | AXP Hours – Planning & Design Tuesday (2/15/22): Today I worked on finishing the screen for 124.5 Cannon […]

Autumn Hinson | AJ Architects | Week 4

Monday (2/7/22): I started work on modeling an adjusted design for a couple of duplexes on Cannon Street. The site has two existing single houses on the street and the back lot is where both duplexes are residing. Total Hours (4:00) | AXP Hours – Planning & Design Tuesday (2/8/22): I continued work on the […]