4.29.19 Daily Blogs and Weekly Reflections

4.29.19 I did not work this date because of thefinal review for studio. 4.30.19 Today, I worked 9am to 5pm on construction documents and wall section details. I am becoming more comfortable with drawing wall section details in autocad and have learned a lot more about construction. 5.1.19 I will not be working this date […]

Week of 4.12

Apr. 8 | Mon. Hours: 8-12 Tasks: The sapele door was finished over the weekend, and came out looking great. I was given a bag of wooden parts that needed to be recreated – these parts were I believe the trim around a boat window. I started with small blanks of teak, on which I […]

Week of 4.5

Apr. 1 | Mon. Hours: 8-12 Tasks: Sand and prepare the stop trim for installation. This trim is put in place the secure the raised panels. Process western red cedar sign blanks: Cross-cut, surface, rip to width, process in shaper, epoxy and clamp.   Apr. 2 | Tue. Hours: 8-12 Tasks: Sand western red cedar […]