03/14/22
RFI revisions- sections drawings and working on drawing a detail for the back of house on a building of Kiawah River hotel.
03/15/22
Design options for all the first floors of the Kiawah river campus by switching out of the walls for MA8 wall types due to FEMA conditions.
03/16/22
Continued working of the design options for FEMA conditions across the KRH campus.
03/17/22
Revised design options and turned in to my mentor for her to review.
Lessons learned:
The importance of keeping a running list of all the steps youve taken to ensure the process is being followed to guarantee good results.