Monday 9.26 (Total Hrs: 4) AXP: 4 PPD Today, I began by making changes to 165 Coming to send to the client. I made changes to the exterior. I made the windows on the porch smaller to be more proportional and in line with the building’s lines. I simplified the eave and Juliette balcony. Tuesday […]
Author: gbethea
Gauge Bethea – Prompt 1
Today, I sat down with my mentor and discussed the topics found in Dana Cuff’s book, Architecture: The Story of Practice, in which she discusses architectural praxis. Praxis is the day-to-day practices that are apparent in each firm; however, the way an individual firm approaches the concept of praxis is uniquely based on its culture. […]
AJ Arch: 9.19-9.22
Monday 9.19 (Total Hrs: 4) AXP: 4 PPD; Today, I took the CAD file of the plans for 27 King and began modeling it in Revit. I finished modeling the first floor and began adding in details for the proposed kitchen Tuesday 9.20 (Total Hrs: 4) AXP: 4 PjM I set up views for the […]
Gauge Bethea/AJ Arch/9.12-9.15
Monday 9.12 (Total Hrs: 4) AXP: 1.5 PjM; 2.5 CE First thing this morning, I finished designing the changes to the elevations of 165 Coming and to sent the PDF off for review. Afterwards, I went on a site visit to 27 King and got existing measurements of the second floor so the plans could […]
Gauge Bethea: RIA 4.18-4.21
Monday 4.18 (Total Hrs: 4) AXP: 3 PPD Today was a slow day in the office. We were all feeling the Monday blues. We discussed a few projects and our weekend. I worked a bit on adding lighting to the reflected ceiling plan on Queens Village. Tuesday 4.19 (Total Hrs: 4) AXP: 4 PPD We […]
Gauge Bethea: Red Iron Architects 4.11-4.14
Monday 4.04 (Total Hrs: 4) AXP: 3.5 PPD I started working again on the toilet renovations for Belle Hall today. We received a finalized scope last week so I started created enlarged demo plans for each of the restrooms. Tuesday 4.05 (Total Hrs: 4) AXP: 4 PPD Today, I continued to create demo plans and […]
Gauge Bethea: Red Iron Architects 4.4-4.7
Monday 4.04 (Total Hrs: 4) AXP: 3 PPD I worked on a wall section today for Queen’s Village and had to figure out how different materials go together. Tuesday 4.05 (Total Hrs: 4) AXP: 4 PM I had a meeting with the owner and GC for Southern Concrete where we are designing an office building […]
Gauge Bethea: Red Iron Architects 3.28-3.31
Monday 3.28 (Total Hrs: 4) AXP: 4 PPD I began helping out today with SCSU’s Queen Village Renovation. I started working on revisions to the CD set based off redlines I was given. I also did some code search for window placement. Tuesday 3.29 (Total Hrs: 4) AXP: 4 PPD Today, I continued helping on […]
Gauge Bethea: Red Iron Architects | March 14-17
Monday 3.14 (Total Hrs: 4) AXP: 4 PDD Today, I continued working on the redlines for Southern Concrete by updating the floor plans and elevations. I designed the patio to go on the rear of the building for the optional adjacent cafe. Tuesday 3.15 (Total Hrs: 4) AXP: 4 PDD I finished up a few […]
Red Iron Architects | March 7-10
Monday 3.07 (Total Hrs: 4) AXP: 4 PDD This week I’ve continued making edits to the toilet renovations. I placed all the single toilets in Revit and created enlarged demo plans for them as well. Tuesday 3.08 (Total Hrs: 4) AXP: 4 PDD I finished up the single toilet plans and continued working on an […]