Meadors 9.23-9.26

9.23.19 8:00-12:00 Project Management, Project Planning and Design Staff meeting, Project Reviews  Discuss BAR-S > scheduling, communication, time management  Prompt discussion: How to build a practice based on people / communities? Jacobik Residence continued Model demo / reno 9.24.19 8:00-12:15 Project Planning and Design Jacobik Residence continued Set up existing, demo and new floor plans […]

Meadors 9.16-9.19

9.16.19 8:00-12:00 Project Management, Project Development and Documentation Staff meeting, Project Reviews  Jacobik Residence – home located on the Isle of Palms  3D model in Revit based from point cloud  9.17.19 8:00-1:00 Project Development and Documentation Jacobik Residence continued 9.18.19 8:00-12:00 Project Development and Documentation Review Dillon I and II Meeting Minutes and Views Jacobik […]

SMHa 4.15 – 4.22

4.15 – 4.17: 4, 4, 0 hrs The beginning of the week was dedicated to all final changes and adjustments to the CD set that went out Wednesday morning for the middle schools. Some adjustments having of needed to have been made per what I mentioned last week with the structural engineer sending necessary drawings […]

SMHa 4.8 – 4.11

4.8 – 3.5 hrs 4.9 – 5 hrs 4.10 – 4 hrs 4.11 – 4 hrs Summary: This week was again a push on red lines as next Wednesday the set is due. There had been some set backs on structural that were relatively out of our control delaying some things that caused us to […]

SMHa 4.1 – 4.4

4.1 – 4 hrs The weekly Monday office meeting as had in the morning with a recap of projects and the outlook for the week. With a final set ready to be put out in about a week majority of everyone in the office is checking drawings or picking up red lines to make sure […]

SMHa 3.25 – 3.28

3.25 – 4 hrs 3.26 – 5 hrs Monday and Tuesday were both spent working on two middle school projects plans. Red lines and dimensions along with labels. A transition into details at the end of the day Tuesday. 3.27 – 4 hrs 3.28 – 3.5 hrs These two days were spent finishing up additional […]

SMHa 3.11 – 3.14

3.11 – 0 hrs. 3.12 – 5 hrs. NRCA detail review and detail drafting, as well as COMcheck. Lunch and learn for WS Nielson Contrarcting in regards to Parasoleil screens. 3.13 – 4 hrs. COMcheck areas, subsystems and r-value spreadsheets 3.14 – 4 hrs. COMcheck subsystems and r-value spreadsheets Summary –  This week was spent […]

SMHa 3.4-3.7

3.4 – 4 hrs. The day was started finishing up the COMcheck areas from last week and moved into doing details for the middle school projects. Particularly bracket and connection details. (Project Development and Documentation) 3.5 – 5 hrs. The details were finished up in the early morning and then a base plan and model […]

SMHa 2.25-2.28

2.25 – 4 hrs. Red lines and drafting details, Project Development and Documentation 2.26 – 5 hrs. Red lines and COMcheck, Project Development and Documentation + a lunch and learn about porcelain panels 2.27 – 4 hrs. COMcheck 2.28 – 3.5 hrs. COMcheck Summary –  This week started off with going through red lines for […]