Daily Logs Monday 11.9.20 Hours Worked: 4 Rejoined and planed stiles, tops and bottoms for kitchen and pantry cabinets. Tuesday 11.10.20 Hours Worked: 5 Ripped stiles, tops and bottoms down to final width for construction to begin. Sanded down to final thickness. Wednesday 11.11.20 Hours Worked: 4 Assembled cabinet carcasses for upper cabinets in the […]
Author: adautry
Aaron Autry + JMO Woodworks Week of 11.2 – 11.5
Daily Logs Monday 11.2.20 Hours Worked: 0 Took this day off because of fall break. Tuesday 11.3.20 Hours Worked: 6 Hung a light in the tool room at the shop. Organized all tools within the tool room and came up with a new ordering system for shop tools. Organized all drawers of drill bits, wrenches, […]
Aaron Autry + JMO Woodworks Week of 10.26 – 10.29
Daily Logs Monday 10.26.20 Hours Worked: 4 Milled down two large pieces of sapelle wood to construct a 19’ window sill element. Scarf jointed together the two pieces together to end up around final length. Tuesday 10.27.20 Hours Worked: 4 Began process of milling and ripping down boards of maple to thin strips in order […]
Aaron Autry + JMO Woodworks Week of 10.19 – 10.23
Since I am ahead on my hours that I need to work for the semester in order to fill out my end of the contract; the entirety of this week I spent at JMO was working on a personal project of mine while having the knowledge and the tools of the people who work there […]
Aaron Autry + JMO Woodworks Week of 10.12 – 10.15
Daily Logs Monday 10.12.20 Hours Worked: 4.5 Made another large cedar sign for a sign company. Glued together a portion of a large double sink vanity for a house on Kiawah Island. Continued milling process of face frame components for cabinets in the same house. Tuesday 10.13.20 Hours Worked: 4 Finished milling process of face […]
Aaron Autry + JMO Woodworks Week 10.5 – 10.8
Daily Logs Monday 10.5.20 Hours Worked: 4 Started to mill down rough lumber in order to make face frames for cabinetry. Cut and glued up large cedar signs for a sign company. Tuesday 10.6.20 Hours Worked: 4 Cut and re-milled lumber from the day before closer to final dimensions. Unclamped and cut cedar signs to […]
Aaron Autry + JMO Woodworks: Week of 9/28 – 10/2
Daily Logs Monday 9.28.20 Hours Worked: 4 Built backing pieces to attach MDF panels to door for the organ casework. Attached panels to door and finished door. Tuesday 9.29.20 Hours Worked: 5 Cut and milled custom window sills for a house out of sapele wood. Finish sanded wooden frames for a sign company to sand […]
Aaron Autry + JMO Woodworks: Week of 9.21 – 9.24
Daily Logs Monday 9.21.20 Hours Worked: 3 Prepared and loaded end tower of organ casework to be delivered to site. Tuesday 9.22.20 Hours Worked: 7.5 Lifted and installed the first of two end towers onto balcony. Wednesday 9.23.20 Hours Worked: 3.5 Loaded trim and crown assemblies to be delivered to site. Moved second end tower […]
Aaron Autry + JMO Woodworks | 9.14.20 – 9.18.20
Daily Logs Monday 9.14.20 Hours Worked: 4 Moved and prepared outside section of organ casework for paint. Loaded center tower into van to take to job site. Installed center tower on balcony Tuesday 9.15.20 Hours Worked: 5 Measured out and prepared to layout the next few towers. Finish sanded wooden signs. Scuff sanded panels for […]
Aaron Autry + JMO Woodworks 9.7.20 – 9.11.20
Daily Logs Monday 9.7.20 Hours Worked: 4 Finish sanded casework for an organ in a chapel Glued up sections of casework Tuesday 9.8.20 Hours Worked: 6 Cleaned up and flattened joints on casework for organ Scuff sanded panels for cabinetry for a house Prepared and dry fitted opposite side of casework for organ Attached […]