This week I continued schematics for Edisto EMS and SC DNR. We went through multiple iterations to figure out how best to fit the EMS station into the very narrow site. The DNR addition was already designed by another firm, our scope is just to provide construction documents to contractors. On Wednesday we had a […]
Author: bmckeel
Alex McKeel – Rosenblum Coe – 11/1-11/4
This week we began working on an addition to the SC DNR office in Bennett’s Point, SC. The addition is an ADA ramp to provide access to the large back deck. On Tuesday we went down to the site, took measurements and pictures and met the clients. The rest of the week I spent drawing […]
Alex McKeel – Rosenblum Coe – 10/25-10/29
This week I made revisions to the Stokes Mazda 45% set per client comments. Other than that, I also did some work logging submittals for the Dorchester EOC project and updating the stick set. Lessons Learned: When going trough the stick set and submittal log for the EOC project, I was reminded of the sheer […]
Alex McKeel -10/18-10/22 – Rosenblum Coe Architects
Total hours: 17 This week I finished the 45% set for the Stokes Mazda project and we submitted them after review/redlines from the principals. Most of the comments were regarding small graphical changes to the Revit sheets to make them match the office conventions. Lessons Learned: The past few weeks I’ve been working on this […]
Alex McKeel – 10/11-10/15 – Rosenblum Coe
Total Hours: 8.5 I did not work on Monday or Tuesday because I was on fall break. On Wednesday I got caught up with how the Stokes Mazda project was progressing after the long weekend and went to an on-site meeting with the client and two of the architects at my firm. We discussed the […]
Alex McKeel – 10/3 – 10/8 – Rosenblum Coe Architects
Total hours 16: This week I continued working on the ChangeUp drawings for the Stokes Mazda renovations. I specifically added soffits, cutouts, and lighting to the reflected floor plans. I also worked on the floor finish plan and assisted a coworker on the exterior elevations, where we are re-cladding the concrete wall that is currently […]
Alex McKeel – 9/27-10/1 – Rosenblum Coe Architects
Total hours worked: 16 This week I continued working on the Stokes Mazda ChangeUp drawings. On tuesday I had a meeting with Josh Caplea and Andrew Horn, who worked on the Stokes Honda ChangeUp project, and were able to offer some guidance and set up a schedule for 45% and 90% deadlines. We organized a […]
Alex McKeel – 9/20-24 – Rosenblum Coe Architects
Total Hours: 16.5 Most of the office was in Greenville for the FIERO conference this week, so I was pretty much on my own working on the Stokes Mazda ChangeUp drawing,, which was exciting. Through referencing the DID, existing drawings, and site photos/notes I was able to refine the existing conditions phase of the Revit […]
Alex McKeel – 9/13-17 – Rosenblum Coe
Total Hours: 17 On Monday we spent the first three hours of work in our weekly staff meeting where we go over goals for the week and check in with the progress of each project. After that, I spent an hour filling in ASI’s and RFI’s on the Dorchester EOC project. On Tuesday I worked […]
Rosenblum Coe Week 3 – 9/10/21
Total hours: 13 This week I obviously did not go to work Monday for labor day. Tuesday we had our weekly staff meeting for about two hours, where we all met the newest hire, Chris, who moved down from Philly. Afterwards, I worked on transcribing and organizing meeting minutes for the Dorchester EOC project for […]