Summary:       This week I continued drawing revisions for 1813 Middle St. There was a major redesign of the hood above the range due to the hood needing large exhaust venting. I then went with my mentor to a meeting with the contractor, client, and architect from RGA to discuss the kitchen along with other work […]

Alexander Poston | JMO Woodworks | Week 13

Summary:       This week I continued working on the Bluffton doors and glued the veneers to the engineered styles. We chose engineered styles for these pocket doors because this will reduce warping in the door since the styles are made of smaller pieces of wood. This will keep the door flatter over time and not allow […]

Alexander Poston | JMO Woodworks | Week 12

Summary:       This week I continued the drawings for the project on concord st. I began shop drawings for 3 pocket doors for one of the local contractors that we work with. I then milled the wood needed to create the engineered styles, the rails, and sticking. I had to replicate the sticking that outlines the […]

Alexander Poston | JMO Woodworks | Week 11

Summary:       This week I created mounting brackets for a surplus of cabinet feet we had in the shop. This involved using calipers to take precise measurements from the feet, draw the bracket in auto cad, then create the gcodes and cut out the brackets on the CNC. The brackets were used to attach feet to […]

Alexander Poston | JMO Woodworks | Week 8

Summary:       This week I continued revising shop drawings for 1813 Middle St. I sat in on a conference call with my mentor and RGA for changes to be made at 1813 Middle St. I unfortunately started feeling ill and tested positive for Covid-19 and was out for the rest of the week.     10/10/22         […]

Alexander Poston | JMO Woodworks | Week 7

Summary:       This week I started making progress on our shop drawings on 1813 Middle St. that we began earlier in the summer. Most of these revisions were to the pantry, adding a pullout shelf under the coffee maker and to the tall pantry cabinet. At the end of the week we delivered a large 14 […]

Alexander Poston | JMO Woodworks | Week 6

Summary:       This week I finished flattening the clear coat for the remaining pieces of the entertainment bar. While I was working on the paint the guys in the shop had been making and assembling parts for window assemblies. I then proceeded to help in the assembly processes. Such as sand and epoxying the joints on […]

Alexander Poston | JMO Woodworks | Week 5

Summary:       This week I finished flattening the clear coat on the upper panels of the entertainment bar. We then installed the lower bar cabinets on site after they received their final polish.   09/19/22         8:40-1:00         4.20 Category 0 Polishing and gun bluing brass washers for high polish entertainment bar for 119 Broad St. Entertainment bar […]