Summary: This week I started making progress on our shop drawings on 1813 Middle St. that we began earlier in the summer. Most of these revisions were to the pantry, adding a pullout shelf under the coffee maker and to the tall pantry cabinet. At the end of the week we delivered a large 14 foot live edge table top that was my first project when a started at JMO.
10/03/22 8:35-12:55 4.20 Category 0 Construction & Evaluation – CE
1813 Middle St. shop drawing revisions.
10/04/22 9:05-1:05 4.00 Category 0 Construction & Evaluation – CE
1813 Middle St. shop drawings revisions. Pull out shelf addition between microwave speed oven and coffee maker.
10/05/22 9:05-1:15 4.10 Category 0 Construction & Evaluation – CE
1813 Middle St. shop drawing revisions in the pantry. Edits to the AV Panel cabinet and adjustable shelves.
010/06/22 8:45-11:45 3.00 Category 0 Construction & Evaluation – CE
Delivery of live edge table slab started at the beginning of my internship. Shop drawing revision continued in the pantry of the 1813 Middle St.
AXP Hours: 15.5 hours