Summary: This week I continued drawing revisions for 1813 Middle St. In between doing this I was in the shop helping to sand and assemble a large bay window for the same project prior to finishing. We had one of our local contractors bring in a rotted column that they needed to be remade. I did most of the sanding prior to finish. I also produced cabinet parts for a project on Queen Street with the CNC router. This involves taking the drawings from autocad and importing them into our slicing software to create g codes. The CNC router can then take the codes and cut out the needed parts.
10/24/22 8:15-12:15 4.00 Category 0 Construction & Evaluation – CE
1813 Middle St. shop drawing revisions, kitchen edits. Pantry and island edits continued per discussion with RGA.
10/25/22 8:45-12:45 4.00 Category 0 Construction & Evaluation – CE
1813 Middle St. shop drawings revisions, pantry continued. 119 Broad St. upper entertainment Bar install 10:30-12:45.
10/26/22 2:45-5:00 2.15 Category 0 Construction & Evaluation – CE
Window assembly in the shop. Sanding column for contractor. 1813 Middle St. shop drawings revisions, pantry continued.
10/27/22 8:45-12:55 4.10 Category 0 Construction & Evaluation – CE
180 Queen St. production of cabinet parts using the CNC router. 330 Concord St. cabinet drawings.
AXP Hours: 14.25 hours