Alexander Poston | JMO Woodworks | Week 10

Summary:       This week I continued drawing revisions for 1813 Middle St. In between doing this I was in the shop helping to sand and assemble a large bay window for the same project prior to finishing. We had one of our local contractors bring in a rotted column that they needed to be remade. I did most of the sanding prior to finish. I also produced cabinet parts for a project on Queen Street with the CNC router. This involves taking the drawings from autocad and importing them into our slicing software to create g codes. The CNC router can then take the codes and cut out the needed parts.

 

 

10/24/22         8:15-12:15       4.00 Category 0 Construction & Evaluation – CE

1813 Middle St. shop drawing revisions, kitchen edits. Pantry and island edits continued per discussion with RGA.

 

10/25/22         8:45-12:45       4.00 Category 0 Construction & Evaluation – CE

1813 Middle St. shop drawings revisions, pantry continued. 119 Broad St. upper entertainment Bar install 10:30-12:45.

 

10/26/22         2:45-5:00         2.15 Category 0 Construction & Evaluation – CE

Window assembly in the shop. Sanding column for contractor. 1813 Middle St. shop drawings revisions, pantry continued.

10/27/22         8:45-12:55       4.10 Category 0 Construction & Evaluation – CE

180 Queen St. production of cabinet parts using the CNC router. 330 Concord St. cabinet drawings.

AXP Hours: 14.25 hours