This week I worked on setting up sheets for the window/door elevations and exterior elevations for the Danielson Rd project. I also had a meeting with Bryan and ran through all the other projects I’m going to start working a lot more on. We are currently remodeling Aspen Meadows which is a high end Bauhaus […]
Month: December 2021
Zachary Stuermer | Bryan May Architecture | 10/25-10/29
This week I made several more Revit edits on the Aspen Meadows project. Bryan added me onto a few more projects this week as well. I’m doing some conceptual design work on another project on Powder Lane and another project over in Little Texas. All good things. AXP: 10hrs
Zachary Stuermer | Bryan May Architecture | 10/18-10/22
This week I continued making edits in Revit for the Aspen Meadows project. There are 7 buildings in this project that all need a lot of edits made to the floor plans, elevations, and sections so it’s been a large task to take on but I am enjoying it. Bryan just added me onto another […]
Zachary Stuermer | Bryan May Architecture | 10/11-10/15
This week I took Monday and Tuesday off for Fall Break. The rest of the week I worked on making edits in Revit for the Aspen Meadows project. I was also able to sit in on the relaunch meeting for 935 North St which is the 80’s house that I’m so obsessed with. We have […]
Zachary Stuermer | Bryan May Architecture | 11/01-10/05
This week I wrapped up Revit edits on Aspen Meadows but the client still wants to see more detail so I need to wait for field verification on a few things before I can edit them. I’m still doing some more conceptual design work on a few other residential projects so that’s been fun. Glad […]
Esther Odeke — Liollio Architecture — Week Fourteen
LOG SUMMARY: 11/29-12/01 | 10 hours 11/29 worked 3 hours worked on preparing laser cut files for the ECHS model in AutoCad worked on Moses Cone Manor project; went through plans and documented all red lines into Revit AXP Hours: 3 11/30 worked 4 hours worked on Moses Cone Manor project; went through plans […]
Alex McKeel – Rosenblum Coe – 11/6-11/10
This week I continued schematics for Edisto EMS and SC DNR. We went through multiple iterations to figure out how best to fit the EMS station into the very narrow site. The DNR addition was already designed by another firm, our scope is just to provide construction documents to contractors. On Wednesday we had a […]
Alex McKeel – Rosenblum Coe – 11/1-11/4
This week we began working on an addition to the SC DNR office in Bennett’s Point, SC. The addition is an ADA ramp to provide access to the large back deck. On Tuesday we went down to the site, took measurements and pictures and met the clients. The rest of the week I spent drawing […]
Alex McKeel – Rosenblum Coe – 10/25-10/29
This week I made revisions to the Stokes Mazda 45% set per client comments. Other than that, I also did some work logging submittals for the Dorchester EOC project and updating the stick set. Lessons Learned: When going trough the stick set and submittal log for the EOC project, I was reminded of the sheer […]
Jessica Longhurst – Week 12 – 11.13.2021 to 11.16.2021 LS3P
Monday: Worked in Revit for Site Plan and Extents of the Post and Courier Site (3.75) Tuesday: Worked on InDesign files for the LTP Academy Project with Caroline (4) Wednesday: Worked on InDesign files for the LTP Academy Project with Caroline (2.25) Watched Revit Videos (1), Found Tennis Storage Bag Precedents (.75) Hours this week: […]