03/04/19 – Monday
Time: 8:30am – 12:30pm (4hrs)
Tasks: Building sections and wall sections (focusing mainly on foundations) for a public park pavilion DD set
AXP: Project Planning & Design
03/05/19 – Tuesday
Time: 8:00am – 1:00pm (5hrs)
Tasks: Building sections, wall sections, and building elevations for a public park pavilion DD set
AXP: Project Planning & Design
03/06/19 – Wednesday
Time: 8:00am – 12:00pm (4hrs)
Tasks: Interior elevations and casework sections for a new fire station
AXP: Project Development & Documentation
03/07/19 – Thursday
Time: 8:00am – 12:30pm (4.5hrs)
Tasks: Coordinating civil information with floor plans (fire station), building sections and wall sections (park pavilion)
AXP: Project Planning & Design, Project Develop & Documentation
Summary
This week, I split my time between the fire station I’ve been working on and the public park pavilion I began working on last week. I’ve enjoyed working on both projects simultaneously. Switching from a project in DD to one in CD’s has kept me on my toes and has kept the days from getting monotonous. Additionally, on Monday we had our monthly staff meeting. I enjoy going to those and seeing how the firm handles internal organization and workload management.
Work Sample
Project Title: Bender Park
Project Location: Bender Park, West Ashley
Project Scope: New park pavilion
Project Manager: Dan Corte
Role of the Student: Production
Description of Images: I’ve included two wall sections of the park pavilion I’ve been working on. They both have storefront windows that look onto a deck and steps or just steps. We are developing a framing system for the deck that changes partway through the site due to a change in existing grade. Where there is sufficient space below the deck, we are utilizing 2x framing on a concrete foundation. At the other end of the site, the deck is going to be installed on sleepers over a slab on grade.