02/28/2022- Day 19

Complete final changes to the ground floor. Verify the square footage matches on the existing floor plan. For the first floor, the front stair entrance does not match what is shown on the existing floor plans. I needed to update it to reflect what we measured and took pictures of during our visit to the property.

03/02/2022- Day 20

Completed As-Builts drawings for the First and second floor. I made a few changes to some doors that were not needed, change of direction, and location of some of them.

03/03/2022- Day 21

I spent most of my time updating the line weights to AV standards. Add fixtures such as toilets, showers, kitchen appliances, etc. Updated windows to show sill and header. Begin to update the roof plan.