Baker Roddey // The Middleton Group // Week Seven
Total and AXP Hours: 16 Hours
This week, I focused on detailing a monument sign for our Block Ice Development. The signage has construction methods and materials based in the actual building. This makes the details similar to working on the exterior wall system. The construction methods involve multiple siding materials, A+M barrier, a true brick wall, that make it a case study on joining different systems. It has a concrete pad, 2 walls, and a roof. The smaller scale has made it easier on me, I have never before worked on wall sections, so this is a good start. It has given me a hint as to why the CD phase is the longest. The details are plentiful.