Monday (2/21/22):
I have been quarantined at home this week with Covid and I was not feeling well today so I updated 2 CAD drawings and made them into PDFs.
Total Hours (0:10) | AXP Hours – Planning & Design
Tuesday (2/22/22):
Today I worked on adjusting the floor plan for 186 St. Philip Street.
Total Hours (3:16) | AXP Hours – Planning & Design
Wednesday (2/23/22):
Today I worked on troubleshooting SketchUp from home and drew the elevations for 186 St. Philip Street. I finally got SketchUp to work and I began making adjustments to 124 Cannon Street. The front stoop needed to be lowered and I need to adjust the windows in the back.
Total Hours (4:01) | AXP Hours – Planning & Design
Thursday (2/24/22):
I continued work on making adjustments to 124 Cannon Street. The windows in the back have been adjusted and the doors and windows on the hyphen have been changed as well.
Total Hours (3:29) | AXP Hours – Planning & Design
Reflection:
This week was a little rough. I was sick through most of it so a lot of brain power was used to just function. I did have trouble with SketchUp and learning to work within groups and components so most of my reflection comes from understanding how those things work.