Landon Hannah – JMO WOODWORKS – Week 3

Hours worked: 16

This week I got to spend some time on site in West Ashley. We were delivering a wall with attached doors to cover the to be installed bar located in the living room. This was designed to be seamless and have various brass accents. Because this would be used as a inset bar area, it it is important that the door leafs are able to open 180 degrees. Later on in the week we returned with large kitchen island. The island being over 10 feet long, we had a skid steer help us get it to the back door, where we intended to stage the island while waiting the the contractors to prepare the space and water hookups.

Leave a Reply

Your email address will not be published. Required fields are marked *