Zachary Stuermer | Bryan May Architecture | 08/30-09/03

This week I worked on documenting the existing conditions and making edits to the Phalen house. This house was built relatively recently but the original design team did a poor job with the mechanical system layout and it runs incredibly inefficiently. We are doing a full mechanical remodel and adding a crawl space that wraps around the majority of the basement level. I’ve been working in revit to document and model the modifications. This project started back in 2019 and has been just slow rolling and finally resurfaced so we are trying to knock it out quickly to move onto the bigger projects we have lined up.

AXP: 15hrs