Red Iron Week 6: 3/21-3/27

This week, I worked on placing a future event barn into Revit as well as existing conditions of an old car garage that will be renovated. I also completed renderings for a PEMB building that will be used in an upcoming RFQ. This week was full of different projects which I enjoyed. I’m excited to […]

Red Iron Week 5: 3/14-3/20

This week I worked on a rendering to be sent to a client for an upcoming children’s camp. I was given the proposal for the rendering and what needed to be in each scene. I also did a detailed section drawing for a staircase for the banner I produced last week. Overall, I’ve been learning […]

April 1st- Site Visit (from zach si at BCA)

Justin and I went to a general monthly meeting with the contractor, owner and architect meeting at one of our job sites. Our firm is designing a swimming club for this newly developed neighborhood in John’s Island. The framing is finished and electrical is being installed. During the meeting the contractor asked out the placement […]

RJ Gross | SGA Narmour Wright Design | 03/15-03/19

This week I only worked on Gibbs Shoals Apartments that will be located in Greer. I reviewed the interior designer’s drawings and matched the architectural changes in the club house. This included adding soffits and ceiling height changes to the interior. I also started correcting general redlines for this project which included adding annotations and […]

RJ Gross | SGA Narmour Wright Design | 03/08-03/11

Hours: 16    AXP: 12 Hours Monday-Thursday: This week at SGA| NW Design I worked on two projects, LIV Windsor Hill Apartments in North Charleston, Gibbs Shoals Apartments in Greer, and Utopia Salon in Charleston. For LIV Windsor Hill Apartments, I annotated the floor plans, reflected ceiling plan, and sections. For Gibbs Shoals Apartments, I […]

Breland Land | Haute Design | 4.5.21-4.8.21

Hours: 15.5 Monday: Completed the wall renderings for Cumbaa and Stafford. These were then sent to the clients for approval. Tuesday: I caught up on organizing some used fabrics into the fabric library and reorganized the trim samples. We had a major mishap where my computer deleted thousands of files in the DropBox. We do […]

Olivia Wideman @ LS3P | 4.5 to 4.8

Hours: 16.75 Total hours: 177.75 This past week at LS3P I worked on 2 new projects and I got to go to a design meeting for an electrical company.   Monday: On Monday I worked on painting diagrams for 2 Beaufort county schools. I went into Autocad and cleaned the plans up, put them into […]