Michael Caraballo: 9/21 – 9/25

DAILY LOGS Monday, September  21 Hours Worked: 8:00 – 12:30 total: 4.5 hours Brewery – continue to study gaming layout and building program Brewery – Narrow the options to 2 designs for the client review. Small office layout – start to put together a permit set for the Design/Development Review Commission AXP Category: Programming and Analysis […]

Shane Lenard Week 9.21.20 – 9.24.20

~Novus Architects~ Monday (9.21.20) Today we had our usual Monday morning meetings with the Charleston office and then the entire office meeting. Today I went back through our drawings from the MDF/IDF project from last week and printed a set for red lining. I then redlined the drawings myself and noticed some errors in the […]

Autumn Hinson + JMO, Week 9.18 – 9.25

Daily Log Monday (9/21): Delivered both end walls to the site AXP Hours: Project Management – 4 hours   Tuesday (9/22): Lifted both end walls onto balcony Installed and shimmed right end wall AXP Hours: Project Management – 4 hours   Wednesday (9/23): Delivered remaining components for installation to site Installed and shimmed left end […]

Brian Heape + Pinnacle Architecture : 09.21.2020-09.24.2020

Pinnacle Architecture 701 East Bay Street, Suite 302 Charleston, South Carolina Week 3 (September 21 – 24) Weekly Hours: 23 Total Hours: 134 Tasks Preformed: Finalize last weeks tasks Begin creating elevation views Create elevation view templates Photograph upcoming project locations Helped create renderings for upcoming project Records of Work: Project Title: Prototype Elementary School […]

Rachel Baca + Datum Workshop: 9.14.20-9.18.20

Daily Logs Monday 9.14.20 Hours Worked: 4 Took design for engraving into Rhino to digitize design Created a tool path for CNC Router Ran CNC Router to complete engraving for table Wednesday 9.16.20 Hours Worked: 4 Assembled acoustical panels for a concrete dome house Thursday 9.17.20 Hours Worked: 4 Continued to work on furniture designs […]