Week of 3.29

ar. 25 | Mon.

Hours: 8-12

Tasks:

Process sapele stock for a raised panel door – surface, rip to width, cut to length, and sand to rough thickness.

Prepare the sapele parts for assembly by drilling mortises and cutting tenons.

Assemble door – epoxy all joints and clamp.

Deliver oak barn door to client on James Island.

 

Mar. 26 | Tue.

Hours: 8-12

Tasks:

Remove sapele door from clamps and sand in the wide belt sander to final thickness.

Visit job-site on Kiawah to make adjustments to a hanging teak day-bed.

 

Mar. 27 | Wed.

Hours: 8-12

Tasks:

Final sand sapele door to remove cross-grain sanding from the wide belt sander.

Prepare blanks for the sapele door by processing them in the shaper to create the raised panel.

 

Mar. 28 | Thu.

Hours: 8-12

Tasks:

Sand sapele raised panels to prepare for assembly in the sapele door.

M