ar. 25 | Mon.
Hours: 8-12
Tasks:
Process sapele stock for a raised panel door – surface, rip to width, cut to length, and sand to rough thickness.
Prepare the sapele parts for assembly by drilling mortises and cutting tenons.
Assemble door – epoxy all joints and clamp.
Deliver oak barn door to client on James Island.
Mar. 26 | Tue.
Hours: 8-12
Tasks:
Remove sapele door from clamps and sand in the wide belt sander to final thickness.
Visit job-site on Kiawah to make adjustments to a hanging teak day-bed.
Mar. 27 | Wed.
Hours: 8-12
Tasks:
Final sand sapele door to remove cross-grain sanding from the wide belt sander.
Prepare blanks for the sapele door by processing them in the shaper to create the raised panel.
Mar. 28 | Thu.
Hours: 8-12
Tasks:
Sand sapele raised panels to prepare for assembly in the sapele door.
M