Week of 3.8

Mar. 4 | Mon.

Hours: 8-12

Tasks:

Field install of bunk beds – install cove mould and coping

 

Mar. 5 | Tue.

Hours: 8-12

Tasks:

Field install of bunk beds – install remainder of cove mould and coping, attach false fronts to bottom bunk, attach guard railing to top bunks.

 

Mar. 6 | Wed.

Hours: 8-12

Tasks:

Prepare sapele stock for shelf support: surface, rip to width, plane to thickness, sand, miter joints.

 

Mar. 7 | Thu.

Hours: 8-12

Tasks:

Delivery and install preparation of teak day bed.

Assist with adding bullet catches to previously installed built-in cabinet doors.