Mar. 4 | Mon.
Hours: 8-12
Tasks:
Field install of bunk beds – install cove mould and coping
Mar. 5 | Tue.
Hours: 8-12
Tasks:
Field install of bunk beds – install remainder of cove mould and coping, attach false fronts to bottom bunk, attach guard railing to top bunks.
Mar. 6 | Wed.
Hours: 8-12
Tasks:
Prepare sapele stock for shelf support: surface, rip to width, plane to thickness, sand, miter joints.
Mar. 7 | Thu.
Hours: 8-12
Tasks:
Delivery and install preparation of teak day bed.
Assist with adding bullet catches to previously installed built-in cabinet doors.